Pet Bottle Filling and Capping for Barrel

Pet Bottle Filling and Capping for Barrel

 

Descriptions :Automatic 5 Gallon Bottle Pure H2o Filling Device/filling production line

Features :
With many proprietary technologies originating from our firm , the 5 gallon h2o filling full system , a main product of our organization ,ranks the prime of the globe ,we are the true leader and extended time period supplier of 5 gallon drinking water bottling line in China .

Major gear things of the barrel h2o filling  production line /PLANT:

The entire line is composed by the pursuing
Automated two heads de-capping device
Automated rotate barrel outdoors brushing device
Automated barrel loading method
Computerized barrel washing equipment
Automatic rotate filling and capping equipment two-in-1
Computerized cap washing and loading program
Sleeve label device with shrinking tunnel
Computerized barrel palletizer equipment
CZPT system
Online video Hyperlink: YWINwatch?v=okwm5m1_rg8&list=PLkdGrU7IvF5NORm6yAyLX0duI574Q1Z57
Just take notice:the depth equipment according to the user’s specifications .

Filling technical description for filling line:
filling  technicas and framework is designed and innovated by ourselves. It adopts
big fluent filling and repair quantify filling . filling valve is SUS fine casting approach,
it has air proof ring to steer clear of attrition of the metallic .it is control by cylinder , and it is
stabilization . in the filling procedure, barrel soon after washing transport  to covey barrel screw.
The covey barrel screw aside the barrel equality to star-wheel. The star-wheel direct the
barrel to filling method.  When the filling cylinder satisfy journey swap,  cylinder moves
down to open filling valve.  Filling valve commence to fill. After filling , cylinder meet with journey
switch yet again and transfer up. Filling valve shut. The barrel soon after filling export by star-wheel.
And transport to capping machine by chains. Filling areas has 12 filling valves to fulfill the speed of the device  at the identical time , liquid place  is nicety since of managing by journey swap.
Main configuration for the complete drinking water  production line :
The whole line is managed by SS electrical carbinate with touch display ,PLC and transducer
brand is Japan Mitsubishi .drinking water pump adopts the most well-known manufacturer in China named
NANFANG ,Motor reducer adopts the joint venture brand name .penumatic method adopts AIRTAC.
 
Get note :the line configuration can be addigned by the customer’s specifications .

Primary parameters of the total five gallon h2o filling production  line :

Identify Operate description
De-capper Automatic discharge cap fro recycled bottle
Out washer Clean and clean bottle’s floor body ,neck and bottom
Interior washer Rinse and sterilize bottle inside of by sizzling lye liquid , recycled h2o , sterilizer ,pure drinking water
Filler Filling h2o into bottles
Capper Sealing bottles by caps
Cap feeder Deliver cap
Cap washer Wash/sterilizer cap
Shrinker Shrink label film at bottle neck
Bottle lifter Bottle is held by double belts and it keeps suspending condition waiting for bing lined with bag manually
Palletizer Use machine to decrease labor drive and use automatic handle to reduce handbook handle

 
primary models:

Name Product Ability BPH
De-capper BG-one a hundred-600
BG-2 900-1200
BG-3 1200-2000
Out washer ST-300 a hundred-300BPH
ST-600 400-600
ST-1200 900-2000
Washer filler capper 3-in-1 QGF-a hundred and twenty a hundred and twenty
QGF-a hundred and fifty one hundred fifty
QGF-150L 150BPH for large mouth bottle
QGF-three hundred 300
CQGF-three hundred 300
QGF-450 450
QGF-600 600
QGF-900 900
QGF-1200 1200BPH CZPT
Rotary filling  QGF-1200R 1200bph rotary type
movie bagging machine BM-one hundred fifty 900-1200BPH
Palletizer MDJ-1200 1200

CE certification

our machine in the globe locations:
vietnam. Russia,india ,Saudi Arabia ,Colombia ,Canada ,Paraguay,Lithuania,Belarus……

 

Pet Bottle Filling and Capping for Barrel